Over the long weekend a huge number of people turned up in sweltering heat to help cut in some more trail. The trail worked on was broken down into two main sections which are shown in the following photos.
From the DH trail heading towards Frogmouth Road. This trail includes the new bridge, some fun uphill swtitchbacks (six of them) and a long flowing benched section. Its the green line on the map.

Climb up to the new bridge
The new bridge
Climb after the bridge which gets pretty close to the DH trail after the last switchback
Leading back to the DH trail from Frogmouth Road. Its the yellow line on the map.
